This material is based upon work supported by the Federal Highway Administration under Grant Agreement No. DTFH61-06-G-00004

Any opinions, findings, and conclusions or recommendations expressed in this publication are those of the author(s) and do not necessarily reflect the view of the Federal Highway Administration.
This document summarizes available guidance on the use of positive protection in temporary traffic control zones and provides a decision support tool on the use of various positive protection devices. It is a companion to a document titled "Work Zone Positive Protection Toolbox"1 produced by the American Traffic Safety Services Association (ATSSA) under the Federal Highway Administration (FHWA) Work Zone Safety Grant. While the toolbox provides both specific information on the various types of positive protection devices currently in use, and guidance on where and how each is typically used, this document provides additional detail on how to determine when positive protection may be warranted.
The determination of when to use positive protection is typically based on either a project-specific engineering study or agency guidelines (which also should be based on an engineering study). Both the project-specific study and agency guidelines typically consider the actual conditions expected to be encountered in the work zone combined with the characteristics of the various devices that may be available. The Roadside Design Guide (RDG) states that "the design and selection of work-zone safety features should be based on expected operating speeds and proximity of vehicles to workers and pedestrians." Additional factors that may impact the decision are provided in these guidelines.
This document is organized into three sections. The first section provides information on the various types of devices and their features. The second section includes information that should be considered in determining the need for positive protection and locations and project types where positive protection may provide benefit. The third section includes decision support tools (Table 1 and Chart 1) for use in determining the most appropriate positive protection device(s) based on project characteristics.
The FHWA defines Positive Protection Devices as devices that contain and/or redirect vehicles and meet the crashworthiness evaluation criteria contained in the National Cooperative Highway Research Program (NCHRP) Report 350.2 Examples of different types of positive protection devices, their typical uses, relative costs, benefits, and specific considerations for use are listed here. Devices covered in this document include portable concrete barriers, ballast filled barriers, steel barriers, moveable concrete barriers, shadow vehicles with attenuators, and vehicle arresting systems.
Typical Uses

Relative Costs and Benefits
Other Considerations
Typical Uses

Relative Costs and Benefits
Other Considerations
Typical Uses

Relative Costs and Benefits
Other Considerations
Typical Uses

Relative Costs and Benefits
Other Considerations
Typical Uses

Relative Costs and Benefits
Other Considerations
Typical Uses

Relative Costs and Benefits
Other Considerations
Recently, FHWA published the Temporary Traffic Control Devices Rule (23 CFR 630, Subpart K) that provides additional information and emphasizes the need to appropriately consider and manage worker and road user safety as part of the project development process. The Rule provides guidance on key factors to consider in reducing worker exposure and risk from motorized traffic. It also requires highway agencies to consider positive protection where such devices offer the highest benefits to worker safety, such as situations where workers may be at increased risk of serious injury from exposure to traffic.
The following list highlights factors to consider in determining need, along with examples of situations where consideration of positive protection devices is required.
(1) Project scope and duration
Positive protection devices such as barriers become more cost effective when used on longer term projects. The Manual on Uniform Traffic Control Devices (MUTCD) defines long term as more than three days, but projects with duration of longer than two weeks may be especially appropriate for positive protection devices requiring substantial effort to install as these projects might otherwise result in substantial worker exposure to motorized traffic. For example, a relatively long section of portable concrete barrier may not be feasible for a project duration shorter than the time it takes to install the barrier.
(2) Anticipated traffic speeds through the work zone
Work Activity Near High Speed Traffic – Workers are at increased risk when traffic speeds are higher. Agencies may define high speed versus low speed, but generally 45 mph or greater is considered a high-speed facility. Consideration should be given to the average speed or the 85th percentile speed in addition to the posted speed limit when determining operating speed. For projects with free flow traffic conditions or limited sight distance, positive protection may be used to shield workers from higher speed traffic.
(3) Anticipated traffic volume
Work Activity Near High Volume Traffic – Workers may be at increased risk when traffic volumes are higher. Volume to capacity ratios may help determine high versus low volume locations. High volume may approach a ratio of 1.0 but not exceed it since congestion will slow traffic naturally, resulting in less volume over time as compared with traffic flow at higher speeds. In general, volumes greater than a few hundred vehicles per lane per hour are considered high volumes. Urban areas may commonly have higher traffic volumes; therefore, consideration of positive protection in such settings is important.
(4) Vehicle mix
Projects on roadways with a high percentage of truck and heavy vehicle traffic may benefit from positive protection due to the greater impact potential of a heavy vehicle intrusion into a work space.
(5) Type of work (as related to worker exposure and crash risks)
The type of construction or maintenance work should also be considered when determining when to use positive protection devices. Work activities that place workers close to moving traffic for extended periods entail the greatest risk to workers and provide the greatest benefit for the use of positive protection. Examples include shoulder maintenance, bridge slab replacement, and widening projects. In addition, shadow vehicles with TMAs and rolling roadblocks can be used to shield workers from traffic during temporary traffic control device installation and removal. Rolling roadblocks that include law enforcement personnel provide time for workers to install and remove devices without direct exposure to traffic.
(6) Distance between traffic and workers, and extent of worker exposure
For operations that place workers close to travel lanes that are open to traffic, positive protection devices provide the greatest value in shielding workers. The value of these devices is enhanced where adequate lateral buffer space does not provide separation between motorists and workers or devices, and a longitudinal buffer is not available to protect workers by giving motorists adequate room to stop upon leaving the traffic space. This may be especially important for bridge projects or confined areas such as tunnels.
(7) Limited escape paths
Projects with limited or no available escape paths within a work zone restrict workers from avoiding errant vehicles that have entered the work space. Bridge and tunnel projects are examples of locations where positive protection can help protect workers with limited escape paths. Likewise projects with a heavy presence of equipment and materials in a confined area, which restrict workers ability to avoid an errant vehicle, can also benefit from positive protection.
(8) Time of day (e.g., night work)
Performing work during off-peak periods may reduce exposure compared with higher traffic levels during peak periods. Even with reduced exposure to higher traffic, consideration should be given to the time of day and potential impacts on visibility during nighttime work when determining the need for positive protection. Paving projects are often performed at night to minimize impacts to traffic flow. Some issues with nighttime work that may help warrant use of positive protection include higher speeds, drowsy drivers, and impaired drivers.
Special consideration should be given to the factors that affect night work operations (lighting, visibility, etc.). The MUTCD does not address night work specifically, but enhancements to temporary traffic control setup for night work zones can be found in NCHRP 475 – A Procedure for Assessing and Planning Nighttime Highway Construction and Maintenance, NCHRP 476 – Guidelines for Design and Operation of Nighttime Traffic Control for Highway Maintenance and Construction, and NCHRP 498 – Illumination Guidelines for Nighttime Highway Work.
(9) Consequences to road users resulting from roadway departure
This situation occurs in areas where motorists are at increased exposure to roadside hazards or are at higher risk of injury from roadway departure, such as where side slopes are greater than 4:1 (horizontal: vertical). Other potential hazards include vertical drop-offs, bridge piers, and construction materials and equipment located in the work space or on the roadside. Agency policy should dictate the magnitude of the drop-off condition that would warrant use of positive protection (the RDG references 3 inches or greater for a drop-off hazard).The RDG should be consulted to determine additional roadway departure hazard considerations.
(10) Potential hazard to workers and road users presented by the device itself and during device placement and removal
Consideration should be given to the exposure created during placement and removal of the positive protection device itself. Additionally, a general rule of thumb is that the device should be protecting against the risk of striking something that may result in worse damage than striking the positive protection device itself (i.e., the damage resulting from driving into a hazard or over a dropoff would be greater than the damage associated with striking the positive protection device). Impacts involving temporary barriers are potentially harmful, and may result in serious injuries to vehicle occupants.
(11) Geometrics and/or work area restrictions that may increase crash risk
Work area restrictions and/or geometric characteristics that increase risk to workers or motorists can also benefit from the use of positive protection devices. For example severe curvature, narrow lanes, restricted sight distance, or narrow shoulders could place workers and motorists at increased risk, and warrant consideration of positive protection. Sufficient advance warning should also be provided to ensure maximum levels of traffic safety around the protective devices.
(12) Access to/from work space
For longer term work zones such as some pavement rehabilitation projects where work vehicles and equipment cannot readily gain access from the ends of the work space, consideration should be given to equipment and construction vehicle access points throughout the work space. In some cases positive protection might cause ingress/egress issues resulting in safety hazards or constructability problems and therefore should be considered carefully in advance. If positive protection is used, crash cushions may be needed to protect the blunt end of barrier sections that provide construction vehicle access when longitudinal barriers are used.
(13) Roadway classification
Positive protection devices should be considered for all roadways when needed, but may be especially important for higher speed, higher mobility roadways such as freeways. For example, portable concrete barriers should be used to separate opposing traffic flows on a freeway crossover and the resulting shared mainline.
(14) Impacts on project cost and duration
Consideration should be given to the cost of the positive protection devices relative to the project duration when determining need. Additionally, methods to minimize or eliminate exposure for workers and motorists should be considered early on in the planning stages of a project. These methods may include traffic diversion, full roadway closures, or work during off-peak periods such as nights and weekends. Positive protection devices can be selected and included in the project design, but should be preceded by consideration of these alternatives to determine the most appropriate plan that will minimize impacts to the safety of workers and motorists, while considering the impacts on project cost and duration. It is important to consider all options for managing traffic prior to determining the need for positive protection.
Table 1 provides guidance on when the various types of positive protection devices may be beneficial. Engineering judgment should be used to determine the appropriate types, but the table provides a summary of the guidance contained in this document to assist practitioners with selection of the appropriate device or devices. Chart 1 provides a decision tool to assist practitioners in determining the most appropriate types of positive protection devices for consideration based on characteristics of the project. Again, engineering judgment should always be used to determine the appropriate type of positive protection.
| Positive Protection Device | Most Appropriate Projects and Locations For Use | Relative Costs and Benefits | Other Considerations |
|---|---|---|---|
| Portable Concrete Barriers | Longer duration stationary projects; areas with limited room for barrier deflection such as bridges and tunnels; drop-off conditions; worker exposure concerns | Substantial installation and removal costs; provide greater benefit on stationary activities compared with those that move such as pavement resurfacing | Require space for placement equipment; contractor access to work area; protection for exposed barrier ends |
| Ballast Filled Barriers | Low-speed urban projects; projects with limited space for concrete barrier placement equipment; areas with room for larger deflection, if needed (some water filled barriers are designed to minimize deflection) | Potentially lower installation and removal costs as they can be placed and removed by hand when unfilled | May be filled with water or sand; consider ballast material transport options, handling, and disposal, along with potential temperature issues (mitigated with environmentally sensitive anti-freeze) |
| Steel Barriers | Short-duration projects such as pavement rehabilitation and maintenance; areas with room for larger deflection (if anchored, deflection can be minimized). May also be used on long-term projects | Lower transport costs due to their lightweight, stackable design, quick installation | Lateral displacement is generally 6 to 8 feet (depending on impacting vehicle); may be anchored to minimize deflection |
| Moveable Concrete Barriers | Longer duration projects; projects where the traffic control configuration is changed frequently (where lanes are opened and/or closed on a daily or nightly basis) | Substantial cost and effort to install; provide benefit on projects where lane configuration changes often | Reconfiguration of the barrier can be accomplished quickly and safely; may be used to optimize directional capacity |
| Shadow Vehicles with TMAs | Mobile, short-duration, and short-term stationary projects such as striping, signal maintenance, vegetation control, pavement patching and repairs, and joint and crack sealing; locations where other barriers may be impractical due to the mobility of the operation | Costs include those for truck, attenuator, and driver – undamaged attenuator may be reused on other projects to spread costs | Adequate roll ahead distance is required to protect workers; consider the potential for motorists to access area between shadow vehicles and workers |
| Vehicle Arresting Systems | Longer term projects where the installation is used over an extended period, such as nightly closure of a roadway over an extended period; used to close an entire area and stop errant vehicles from intruding | Fixed end anchors require substantial effort to install; temporary anchors provide a lower cost solution for short-term applications | Requires adequate buffer space to allow vehicle to slow to a stop; consider work vehicle access to the closed area |
Since the barrier may be a hazard itself, first check to make sure that the hazard you are protecting is more dangerous than traffic exposure to the barrier. Hazards may include worker exposure to traffic, a slope steeper than 6:1, drop-off conditions greater than 3 inches, etc. If protection is needed, then use the following chart to determine which type to use.
Chart 1: Decision Tool for Selecting Various Types of Positive Protection Devices 
Three main sources of guidance for this topic include the Work Zone Rule Subpart K, the Manual on Uniform Traffic Control Devices (MUTCD), and the American Association of State Highway and Transportation Officials (AASHTO) Roadside Design Guide. Additionally, agency-specific standards, policies, and guidelines may define strategies to be used based on project and roadway characteristics. NCHRP 20-7 (174) – Use of Positive Protection in Work Zones also provides information on practices in use by transportation agencies.
The following links provide additional resources, and some include more information on positive protection and the techniques described in this document:
FHWA Work Zone Mobility and Safety Program: http://ops.fhwa.dot.gov/wz/
FHWA Work Zone Peer-to-Peer Program: http://ops.fhwa.dot.gov/wz/p2p/index.htm
The Manual on Uniform Traffic Control Devices: http://mutcd.fhwa.dot.gov/
"Work Zone Positive Protection Toolbox": http://www.atssa.com/galleries/default-file/WZ%20Positive%20Protection%20Toolbox%20LL%20-%20FINAL.pdf
AASHTO: http://www.aashto.org
NCHRP 20-7 (174) – Positive Protection Practices in Highway Work Zones: unpublished - Available upon request from NCHRP staff.
1 Refer to http://www.atssa.com for a copy of this document.
2 Ross, H., D. Sicking, and R. Zimmer. NCHRP Report 350, Recommended Procedures for the Safety Performance Evaluation of Highway Features. Transportation Research Board of the National Academies, 1993.
Posted: 11/2/2010