Publication Details
Title: Supplemental Specifications and Special Provisions to Arkansa's 2003 Standard Specifications for Highway Construction
Abstract: The supplemental specifications and special provisions contain the following sections: ERRATA for the 2003 edition standard specifications for highway construction, posters and notices required for federal-aid projects, wage rate determination, optional training program, goals for disadvantaged business enterprise participation, disadvantaged business enterprise (DBE) participation form, required contract provisions for state construction jobs, determination of DBE participation, construction control markings, worker visibility, liquidated damages, liquidated damages, liquidated damages, aggregate base course, production verification of asphalt concrete hot mix, asphalt concrete cold plant mix, cement for portland cement concrete pavement, water for vegetation, retroreflective sheeting for traffic control devices in construction zones, pipe culverts for side drains, preformed detector loops, concrete pull box, design and material requirements for span wire support poles, design and material requirements for traffic signal mast arms and poles, design and material requirements for traffic signal pedestal poles, reflectorized paint pavement markings, glass beads for thermoplastic pavement markings, general requirements for signs, cement for concrete for structures and paint color.
Publisher: Arkansas State Highway and Transportation Department
Publication Date: 2006
Full Text URL: Link to URL