Practice Details
State Agency: Connecticut
Practice Provision: Placement of G20-1 signs
Description:
In Connecticut, G20-1 signs are used on freeways where the length of work is extensive, usually 5 miles or more, to warn the public of an unusually long work zone. The sign is located where it can be fit inside the sign pattern for the project. W20-1 "ROAD WORK AHEAD" is located 1 mile from the beginning of the work zone. It is the only "ROAD WORK AHEAD" sign used in the pattern.
Contact:
Mr. John F. Carey
Connecticut Department of Transportation
Traffic Engineering
Manager
2800 Berlin Turnpike
Room: 4321 NWA
Newington, Connecticut 06131-7546
Phone: (860) 594-2710
Fax: (860) 594-3376
Email: John.F.Carey@po.state.ct.us