Safe Installation and Removal of Temporary Traffic Control Devices

Some documents are made available in PDF format. You will need Adobe Reader PDF document - Download the most recent version of the Adobe Acrobat Reader to view this document. to view them.

PDF version [1.6 MB]

Developed By:

ATSSA logo.

Slide notes:

Key Message: Introductory slide
Est. Presentation Time: Less than 1 minute (Total for entire module is estimated at 60 minutes)
Explanation of Cues/Builds: None
Suggested Comments: Let's begin the Installation and Removal of Traffic Control Devices for Safe Maintenance and Work Zone Operations training module. The type of operation (moving, stationary, etc.) is a consideration for proper installation and removal although practices and principles don/t vary across different types of maintenance operations. However, the duration and location of work is an important consideration in determining the temporary traffic control strategies. This course is based on the Grant product titled "Field Guide on Installation and Removal of Temporary Traffic Control for Safe Maintenance and Work Zone Operations."
Suggested Questions: None
Additional Information: None
Possible Problems: None

__________________________________________________ 

slide 2

About This Course

This material is based upon work supported by the Federal Highway Administration (FHWA) under grant agreement NO. DTFH61-06-G-00004

FHWA logo.

slide notes:

Key Message: FHWA disclaimer
Est. Presentation Time: Less than 1 minute(s)
Explanation of Cues/Builds: None
Suggested Comments: Self explanatory
Suggested Questions: None
Additional Information: Information about the grant can be found at www.atssa.com
Possible Problems: None

__________________________________________________ 

slide 3

Module Objectives
  • Understand safe installation and removal of temporary traffic control devices
  • Identify relevant considerations and safety issues during these activities
  • Describe methods and procedures for safe installation and removal
  • Discuss the importance of proper installation and removal procedures
  • Discuss the sequence to install and remove devices

slide notes:

Key Message: State the module objectives
Est. Presentation Time: Less than 1 minute(s)
Explanation of Cues/Builds: None
Suggested Comments: Each state or local agency may have preferences on how their agency may perform installation and removal of temporary traffic control devices, therefore designers and contractors should check with individual agencies for guidance and/or preference on these procedures.
Suggested Questions: None
Additional Information: None
Possible Problems: None

__________________________________________________ 

slide 4

Types of TTC Zones Covered
  • Long term stationary
  • Short term stationary
  • Short term mobile and moving operations
  • Detours
  • Interior lane closures
  • Median crossovers

slide notes:

Key Message: State the types of temporary traffic control zone types that will be covered.
Est. Presentation Time: Less than 1 minute(s)
Explanation of Cues/Builds: None
Suggested Comments: Some of the techniques mentioned in this module can be applied to various work zone types. The types of temporary traffic control zone setups listed are some examples of the ones referred to in the slides.
Suggested Questions: None
Additional Information: None
Possible Problems: None

__________________________________________________ 

slide 5

Safe Operation?
  • Installation and removal of setups involves substantial risk if not done properly

Photo of a worker dropping cones off the back of a truck. The worker is seated on the end of the truck bed with his legs hanging off. A yellow balloon instructs 'Legs should never hang!'

slide notes:

Key Message: Discuss installation and removal procedures
Est. Presentation Time: 2 minute(s)
Explanation of Cues/Builds: Text box appears upon click
Suggested Comments: Installation and removal activities could involve substantial risk if not done properly and with the correct safety measures in place. It represents the first and potentially highest timeframe of exposure for workers.
Suggested Questions: Is this a safe operation? What can go wrong here? Discuss the position of the worker, also.
Additional Information: The MUTCD does not discuss this material.
Possible Problems: None

__________________________________________________ 

slide 6

High Visibility Apparel
  • ANSI Class 2 apparel is required for all workers when placing and removing devices
  • ANSI Class 3 apparel is recommended for some types of work
  • Class 3 vests are required to have sleeves, but retroreflective pants may be worn in addition to a Class 2 vest

slide notes:

Key Message: Discuss use of high visibility safety apparel
Est. Presentation Time
: 1 minute(s)
Explanation of Cues/Builds
: Text box appears upon click
Suggested Comments
: Installation and removal activities require use of high visibility apparel. Class 2 apparel is required when placing and removing devices, and local or state standards may require use of Class III apparel during installation and removal, especially at night. The MUTCD requires high visibility apparel for all situations where workers are exposed to traffic or work/construction vehicles.
Suggested Questions
: None
Additional Information
: Check state or local specifications and see MUTCD 6D.03.
Possible Problems
: None

__________________________________________________ 

slide 7

Vehicle Delineation/Lights
  • Provides additional visibility of vehicles through:
    • Warning lights on vehicles
    • Retroreflective markings on vehicles
  • Used in addition to signs, arrow boards, TMAs, PCMS, and apparel

Photo of a group of workers standing in tall grass in front of an orange work van parked on the side of the road. The van has amber lights on the roof above the driver's compartment and along the rear of the van's top, perpendicular to the body of the van.

slide notes:

Key Message: Discuss use of vehicle delineation and lights
Est. Presentation Time
: 1 minute(s)
Explanation of Cues/Builds
: None
Suggested Comments
: To improve motorist and work-crew safety, equipment must be readily seen and recognized and, therefore, warning lights should be provided on the equipment to alert motorists of potentially hazardous situations. Section 6D.03 of the MUTCD states that shadow vehicles with appropriate warning lights and signs may be used to protect workers. Additionally, retroreflective tape may be used on shadow trucks and device setting vehicles to provide motorists with a better visual of the outline of the vehicle. The MUTCD states that vehicle hazard warning lights may be used to supplement other lights on vehicles, but not in place of the high-intensity rotating, flashing, oscillating, or strobe lights. These devices are used in addition to retroreflective signs, PCMS, TMAs, arrow boards, and retroreflective apparel for workers (Class II or III).
Suggested Questions
: None
Additional Information
: Check state or local specifications for use of warning lights. Picture courtesy of the AAA Foundation for Traffic Safety (aaafoundation.org)..
Possible Problems
: None

__________________________________________________ 

slide 8

Washington State DOT Policy - Warning Lights
  • Requires two supplemental amber lights
  • At night, flashing lights must be off to avoid glare

Photo of a work truck with an attentuator mounted at the back. Bars mounted on the attenuator are used to mount two rotating amber lights at drivers' eye-level, which are highlighted with red circles.

slide notes:

Key Message: Discuss use of vehicle warning lights
Est. Presentation Time
: 1 minute(s)
Explanation of Cues/Builds
: None
Suggested Comments
: Washington State DOT developed a specification for use of warning lights. This example shows two supplemental amber lights in addition to the arrow board. When an arrow board or PCMS is used at night, the adjacent flashing warning lights must be turned off to avoid glare and possible driver confusion. The policy states that red lights can be used when they flash simultaneously, and amber lights can be used either flashing simultaneously or alternating. Blue lights can only be used on emergency vehicles. Vehicle-mounted work lights on the rear of the vehicle can only be used in a work zone if the work zone is protected by traffic control equipment such as an attenuator truck.
Suggested Questions
: None
Additional Information
: This is one example of a policy on warning lights. Photo courtesy of WSDOT.
Possible Problems
: None

__________________________________________________ 

slide 9

Michigan Policy – Lights and Markings
  • Requires 360 degree amber warning lights on all vehicles in the work zone
  • Requires LED strobes on applicable vehicles
  • Outlines a standard for conspicuity tape on the side of vehicles

slide notes:

Key Message: Discuss use of vehicle warning lights and retroreflective markings
Est. Presentation Time
: 1 minute(s)
Explanation of Cues/Builds
: None
Suggested Comments
: This slide shows excerpts from the Michigan DOT policy on vehicle visibility. The policy requires 360 degree amber warning lights on all vehicles in the work zone (no other color is allowed but the lens can be clear) with the exception of lights used to illuminate a work space. It also requires Federal Motor Carrier Safety Administration (FMCSA) recommended placement of conspicuity tape, where such tape is needed (use is not a requirement). The FMCSA standard requires a width of 50mm, 75mm, or 100mm for conspicuity tape on vehicles. MDOTs policy says that tape shall be alternating red and white, 2 inches (50mm) wide, applied to 50 percent of each side, and the full width of the rear of the vehicle.
Suggested Questions
: None
Additional Information
: Check state or local specifications. Also see 49 CFR 571.108 for FMCSA.
Possible Problems
: None

__________________________________________________ 

slide 10

Advance Preparation Checklist
  • Review plans
  • List the devices needed and make sure they are available
  • Visit site in advance
  • Develop a plan for how to implement TCP
  • Assign duties to each crew member
  • Notify utility companies and law enforcement agencies (as needed)
  • Have emergency contacts information in the vehicle

slide notes:

Key Message: Discuss installation and removal procedures
Est. Presentation Time: 2 minute(s)
Explanation of Cues/Builds: None
Suggested Comments: The checklist includes several items. Locate and collect the devices you need to implement the temporary traffic control plans before proceeding to the site. Always review plans to be sure you have accounted for everything that is needed. Also be sure that they devices are available and determine a plan for how to accomplish the installation and removal. Discuss procedures and review installation and removal plans so that everyone is aware of his/her responsibilities. Make sure all workers have the appropriate training to perform their intended functions. Have a list of emergency contracts readily available. Visit the site in advance and discuss the procedures that you have reviewed, staging locations, etc. Be sure law enforcement personnel are aware of the activity as needed. Be prepared and do your homework!
Suggested Questions: None
Additional Information
: The MUTCD does not discuss this material.
Possible Problems
: None

__________________________________________________ 

slide 11

Laying out the traffic control

Which location do we need to identify first in the field?

Diagram of a roadway with part of one lane closed off due to a work zone. A balloon reads 'The beginning of the work space!' and points to the edge of the marked off work space within the work zone.

Begin measurements from the work area against the flow of traffic, facing traffic at all times.

slide notes:

Key Message: Discuss installation and removal procedures
Est. Presentation Time: 3 minute(s)
Explanation of Cues/Builds: Text boxes (3) appear upon click
Suggested Comments: Self explanatory. Be prepared and do your homework!
Suggested Questions: Which point do we need to locate first in the field? The beginning of the work space! Everything is measured form there, working your way towards traffic, to mark the location of all devices. Only then are we ready to bring devices to the site for installation. For installation, install devices WITH THE FLOW OF TRAFFIC until the installation is complete.
Additional Information: The MUTCD does not discuss this material.
Possible Problems: The following slides visually show this sequence.

__________________________________________________ 

slide 12

Installing Stationary Lane Closures
  1. Lay out the traffic control
    • Determine the beginning of the work space.
    • Measure and mark:
      • Buffer space
      • Taper length
      • Shoulder taper, if used
      • Sign spacing

Photo of a measuring wheel and a label indicating 'Use white or pink marking paint only.'

slide notes:

Key Message: Summarize sequence of installation and removal procedures
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: Text box appears upon click
Suggested Comments: In summary, erect the sign the motorists would see first, and proceed "with the flow of traffic" until you complete the installation.
Suggested Questions: Why white and pink only? All other colors are taken!
Additional Information: The MUTCD does not discuss this material. Utility color code;
RED = Electric
YELLOW = Gas/Oil
BLUE = Water
GREEN = Sewer
ORANGE = Communications/Cable TV
PINK = Temporary Survey Markings
WHITE = Proposed Excavation
Possible Problems: These colors are generally accepted in some areas. These may differ by location.

__________________________________________________ 

slide 13

Installing Stationary Lane Closures
  1. If post-mounting signs, call for utility location markings

Photo of a person making a yellow mark on a roadway. Box below image says 'Yellow is a utility marking color!'

slide notes:

Key Message: Summarize sequence of installation and removal procedures
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: None
Suggested Comments: Self explanatory
Suggested Questions: None
Additional Information: The MUTCD does not discuss this material.
Possible Problems: You just discussed the need for white or pink only, but this picture shows yellow markings. This is to illustrate the point that utility location markings are needed prior to digging for post mounted signs.

__________________________________________________ 

slide 14

Installing Stationary Lane Closures
  1. Install the first sign(s) motorists will see. Proceed downstream ("with the flow of traffic")
    • Cover signs that do not apply

Diagram depicts a roadway and the locations where warning signs should be placed on both the right and left side of the road. As drivers approach the work area, the first sign reads 'Road Work XX Miles,' the second, placed a closer to the work area, reads 'Right Lane Closed XX Miles,' and the last sign is a warning that traffic in the right lane must merge left.

slide notes:

Key Message: Summarize sequence of installation and removal procedures
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: None
Suggested Comments: Self explanatory
Suggested Questions: None
Additional Information: The MUTCD does not discuss this material.
Possible Problems: None

__________________________________________________ 

slide 15

Installing Stationary Lane Closures
  1. Install the shoulder taper, if used
  2. If required, place an arrow board in the proper location per the TCP

Photo of a portable arrow panel.

slide notes:

Key Message: Summarize sequence of installation and removal procedures
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: None
Suggested Comments: Arrow boards should be on the shoulder at the beginning of the taper, or as close to the front of the taper as possible.
Suggested Questions: None
Additional Information: The MUTCD does not discuss this material.
Possible Problems: None

__________________________________________________ 

slide 16

Installing Stationary Lane Closures
  1. Place channelizing devices at the required spacing for the appropriate distance to form the taper

Photo of a worker dropping traffic cones from a work truck.

slide notes:

Key Message: Summarize sequence of installation and removal procedures
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: None
Suggested Comments: The preferred method for placing devices is from a safe position on a moving vehicle (see platform examples later in this module). If speeds are low and the area is an urban setting, workers may be able to safely walk the devices into place. If on foot, have a shadow truck for protection.
Suggested Questions: None
Additional Information: The MUTCD does not discuss this material.
Possible Problems: None

__________________________________________________ 

slide 17

Installing Stationary Lane Closures
  1. Install devices at the appropriate spacing to form the buffer space
  2. Continue placing devices at the appropriate spacing throughout the work space moving downstream

Photo of a worker with his back to oncoming traffic adjusting traffic cones. Text box asks, 'What is he doing wrong?'

slide notes:

Key Message: Summarize sequence of installation and removal procedures
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: None
Suggested Comments: Avoid turning your back on traffic when placing devices. Often it may be difficult to perform your duties without brief periods where you must turn your back toward traffic. If workers must be oriented where they cannot see traffic, they should use a TMA or have a spotter watching traffic with an air horn to provide warning.
Suggested Questions: What is this person doing wrong? He has his back turned to traffic and is unable to see and react to an errant vehicle.
Additional Information: The MUTCD does not discuss this material.
Possible Problems: None

__________________________________________________ 

slide 18

Installing Stationary Lane Closures
  1. If required, place devices 20 feet apart to create a 100-foot long downstream termination taper.
  2. If required, install the END ROAD WORK sign
  3. Drive-through inspection
    • If at night, nighttime inspection is needed for night work

An 'End Road Work' sign.

slide notes:

Key Message: Summarize sequence of installation and removal procedures
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: None
Suggested Comments: Self explanatory
Suggested Questions: None
Additional Information: The MUTCD does not discuss this material.
Possible Problems: None

__________________________________________________ 

slide 19

Step 1. Lay Out the Traffic Control

Diagram of a two-lane roadway. White arrows in each lane indicate the direction of travel is the same for both lanes. Blue dots are placed on the right shoulder, and a large red arrow is pointing in the opposite direction of traffic.

 

slide notes:

Key Message: Discuss sequence of installation procedures
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: Arrow appears upon click
Suggested Comments: Determine beginning of work space first, then work against the flow of traffic to determine buffer space, taper length, shoulder taper (if used), and then sign spacing.
Suggested Questions: None
Additional Information: None
Possible Problems: None

__________________________________________________ 

slide 20

Step 2. If post mounting signs, call for utility locations

Diagram of a two-lane roadway with traffic in each lane moving in the same direction. Three blue dots are positioned on the lower right of the diagram on the shoulder. Beside the dots is a large red arrow pointing in the direction of traffic.

 

slide notes:

Key Message: Discuss sequence of installation procedures
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: Arrow appears upon click
Suggested Comments: Discuss as needed.
Suggested Questions: None
Additional Information: The MUTCD does not discuss this material. An additional note – For a stationary lane closure, the arrow panels should be placed on the shoulder at the beginning of the taper. If room is not available on the shoulder (for example, the shoulder is narrow), place in the closed lane as close to the front of the taper as possible. If arrow displays are used when multiple lanes are closed in tandem, the preferred position for additional arrow displays is in the closed lane at the start of the merge taper. Under various situations, such as for narrow shoulders, placement may be in the middle or at the end of the merge taper but always behind the channelizers. The panel shall be located behind any channelizing devices used to transition traffic from the closed lane.
Possible Problems: The following slides visually show this sequence.

__________________________________________________ 

slide 21

Step 3. Install Advance Warning Signs

to warn the motorists of activity on or near the road.

Graphic of a two lane roadway with arrows indicating traffic is flowing in the same direction in both lanes. Orange triangles at the bottom of the image on the right and left side of the roadway represent advance warning signs. An arrow to the right of the diagram parallels the flow of traffic and indicates the work zone should be set up 'with' the flow of traffic.

slide notes:

Key Message: Discuss sequence of installation procedures
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: Arrow appears upon click
Suggested Comments: Advance warning signs provide guidance to motorists on how to maneuver through the work zone. They also warn drivers that installation activities are going on when applicable. Placement of signs and sign spacing must comply with the MUTCD. The first sign attracts attention (Road Work Ahead), the second sign tells drivers what to expect (Right Lane Closed Ahead), and the third sign tells them that the lane is ending and that they need to merge left (Lane Ends).
Suggested Questions: None
Additional Information: The MUTCD does not discuss this material.
Possible Problems: None

__________________________________________________ 

slide 22

Step 4. Install shoulder taper (if used)

 

Graphic of a two lane roadway with arrows indicating traffic is flowing in the same direction in both lanes. Orange triangles at the bottom of the image on the right and left side of the roadway represent advance warning signs. Three squares set at an angle from right edge of the shoulder extending over and to the left, up to the travel lane, indicate a taper on the right shoulder. An arrow to the right of the diagram parallels the flow of traffic and indicates the work zone should be set up 'with' the flow of traffic.

slide notes:

Key Message: Discuss sequence of installation procedures
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: Arrow appears upon click
Suggested Comments: Discuss as needed.
Suggested Questions: None
Additional Information: None
Possible Problems: The following slide is not to scale and the number of devices needs to be calculated for every instance when using a shoulder taper. It is common to use lane width OR shoulder width to calculate the shoulder taper length. Maintenance engineers often use the shoulder width.

__________________________________________________ 

slide 23

Step 5. Install arrow board

 

Graphic of a two lane roadway with arrows indicating traffic is flowing in the same direction in both lanes. Orange triangles at the bottom of the image on the right and left side of the roadway represent advance warning signs. Three squares set at an angle from right edge of the shoulder extending over and to the left, up to the travel lane, indicate a taper on the right shoulder. An arrow board is positioned beyond the taper. An arrow to the right of the diagram indicates the work zone should be set up 'with' the flow of traffic.

slide notes:

Key Message: Discuss sequence of installation procedures
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: Arrow appears upon click
Suggested Comments: Truck or trailed mounted arrow boards may be used continuously or intermittently. If the arrow board is always on it can be positioned and left for the remained of the project. If it is turned off at any time it should be protected or moved. When not in use, consider this priority order for positioning: 1) removing the arrow board, 2) moving it beyond the clear zone, or 3) moving it away from traffic and delineating it with channelizing devices such as drums.
Suggested Questions: None
Additional Information: For a stationary lane closure, the arrow boards should be placed on the shoulder at the beginning of the taper. If room is not available on the shoulder (for example, the shoulder is narrow), place in the closed lane as close to the front of the taper as possible. If arrow boards are used when multiple lanes are closed in tandem, the preferred position for additional arrow displays is in the closed lane at the start of the merge taper. Under various situations, such as for narrow shoulders, placement may be in the middle or at the end of the merge taper but always behind the channelizing devices. The boards shall be located behind any channelizing devices used to transition traffic from the closed lane.
Possible Problems: None

__________________________________________________ 

slide 24

Step 6. Install taper

Typically not used on short duration operations of 12 hours or less

Graphic of a two lane roadway with arrows indicating traffic is flowing in the same direction in both lanes. Orange triangles at the bottom of the image on the right and left side of the roadway represent advance warning signs. A taper extends from the right edge of the shoulder over and to the left at an angle, crossing the right travel lane and stopping at the dashed white line. An arrow board is positioned beyond the taper. An arrow to the right of the diagram indicates the work zone should be set up 'with' the flow of traffic.

slide notes:

Key Message: Discuss sequence of installation procedures
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: Arrow appears upon click
Suggested Comments: Self explanatory. Discuss as needed.
Suggested Questions: None
Additional Information: The maximum spacing between devices is equal to the posted speed.
Possible Problems: : Removed the shoulder taper for visual appearance of slide.

__________________________________________________ 

slide 25

Step 7. Install channelizing devices along the buffer space
  • Continue "with the flow of traffic"

Continuation of the previous diagram's development. In this image, the taper extends from the right edge of the shoulder over and to the left at an angle, crossing the right travel lane and continuing straight up along the dashed white line, closing off the right lane. An arrow to the right of the diagram indicates that work should continue to proceed 'with' the flow of traffic.

slide notes:

Key Message: Discuss sequence of installation procedures
Est. Presentation Time: 2 minute(s)
Explanation of Cues/Builds: None
Suggested Comments: Self explanatory. Discuss as needed.
Suggested Questions: Now that the installation is complete, what's the next step? Drive through inspection.
Additional Information: The MUTCD does not discuss this material.
Possible Problems: Drive through inspection is usually required by the State, not in MUTCD.

__________________________________________________ 

slide 26

Step 8. Install channelizing devices along the work space
  • Allow space for equipment, materials, and vehicles between the work space and buffer space

Continuation of the previous diagram's development. In this image, the taper has been advanced so that it runs parallel to and just beyond the work area. An arrow to the right of the diagram indicates that work should continue to proceed 'with' the flow of traffic.

slide notes:

Key Message: Discuss sequence of removal procedures
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: Arrow appears upon click
Suggested Comments: Self explanatory.
Suggested Questions: None
Additional Information: The MUTCD does not discuss this material. The maximum spacing between devices along the work space is equal to two times the posted speed.
Possible Problems: None

__________________________________________________ 

slide 27

Step 9. Install channelizing devices to form the termination taper, if used

Termination areas are typically optional on short duration operations of 12 hours or less

Continuation of the previous diagram's development. In this image, the taper runs parallel to and just beyond the work area before angling back to the right, ending at the white line that indicates the edge of the right travel lane. An arrow to the right of the diagram indicates that work should continue to proceed 'with' the flow of traffic.

slide notes:

Key Message: Discuss sequence of installation procedures
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: Arrow appears upon click
Suggested Comments: Discuss as needed.
Suggested Questions: None
Additional Information: None
Possible Problems: None

__________________________________________________ 

slide 28

Step 10. Install END ROAD WORK sign, if used

Typically not used on short duration operations of 12 hours or less

Continuation of the previous diagram's development. In this image, the taper runs parallel to and just beyond the work area before angling back to the right, ending at the white line that indicates the edge of the right travel lane. An orange square on the right edge of the diagram, on the shoulder, indicates the placement of the 'End Road Work' sign. An arrow to the right of the diagram indicates that work should continue to proceed 'with' the flow of traffic.

slide notes:

Key Message: Discuss sequence of removal procedures
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: Arrow appears upon click
Suggested Comments: Discuss as needed.
Suggested Questions: None
Additional Information: The MUTCD does not discuss this material.
Possible Problems: None

__________________________________________________ 

slide 29

Step 11. Inspection
  • Drive-through inspection
  • Put yourself in the position of the driver
  • How are other motorists navigating it?
  • Is everything in its correct place? Visible?
  • Document it!

Diagram of a completely setup work zone, as described in previous images, with the image of a magnifying glass set against it.

slide notes:

Key Message: Discuss sequence of installation procedures
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: None
Suggested Comments: Now that the installation is complete, the next step is to perform a drive-through inspection. Drive-through inspections may be mandated at the state level and are encouraged at the federal level. If the closure extends overnight, a drive-through inspection should also be conducted after sunset to assess traffic control under all applicable conditions.
Suggested Questions: Why do we do a drive-through at night? To see how visible devices are and whether drivers might have any difficulties seeing them and reacting appropriately.
Additional Information: MUTCD section 6B.01: “To provide acceptable levels of operations, routine day and night inspections of TTC elements should be performed.”
Possible Problems: Drive-through inspection is usually required by the State.

__________________________________________________ 

slide 30

Removal
  • What would you remove first?
  • Why?
  • Main objective?

Diagram of a completely setup work zone, as described in previous images. An arrow to the right of the diagram indicates that deconstruction should move 'against' the flow of traffic.

slide notes:

Key Message: Discuss sequence of removal procedures
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: Arrow appears on click
Suggested Comments: Removal may start after the work space is clear.
Suggested Questions: What would you remove first? The termination area, to leave the advance warning area up for as long as possible. The main objective is safety for workers, motorists, and pedestrians.
Additional Information: The MUTCD does not discuss this material.
Possible Problems: Drive-through inspection is usually required by the State.

__________________________________________________ 

slide 31

Termination area should be removed first
  • Termination area first, keep as much behind you as possible for protection

Diagram of a completely setup work zone, as described in previous images. An arrow to the right of the diagram indicates that deconstruction should move 'against' the flow of traffic.

Text box reads 'Which way should the truck be pointed?'

slide notes:

Key Message: Discuss sequence of removal procedures
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: Arrow appears on click
Suggested Comments: Removal may start after the work space is clear.
Suggested Questions: How is this accomplished – which way should the truck be pointed and how does it move? This may vary by location. Some states require the vehicle to proceed with legal traffic movements and therefore require the vehicle to back up in the closed lane. Other states require removal of devices to the shoulder prior to pick up, and typically a truck would drive with the flow of traffic on the shoulder once the devices are out of the travel way. If driving in reverse, an attenuator could be used on the truck to protect motorists from impact. When driving forward against the flow of traffic, some consider the engine to provide some protection to the work vehicle in the event of impact compared to rear impact without an attenuator (impact is away from the gas tank, etc.). This, however, may be less safe for the motorist.
Additional Information: The MUTCD does not discuss this material. Try to create discussion about the local policy/practice.
Possible Problems: None

__________________________________________________ 

slide 32

Work space clear? Cleaned?
  • Continue removal against the flow of traffic

Diagram of an almost completely setup work zone, as described in previous images, from which the 'End Road Work' sign and the termination taper have has been removed. An arrow to the right of the diagram indicates that deconstruction should move 'against' the flow of traffic.


slide notes:

Key Message: Discuss sequence of removal procedures
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: None
Suggested Comments: Removal may start after the work space is clear.
Suggested Questions: See slide.
Additional Information: The MUTCD does not discuss this material.
Possible Problems: None

__________________________________________________ 

slide 33

Remove Buffer Space

Continue removal against the flow of traffic

Diagram of a two lane roadway where a work zone is being deconstructed. The termination taper and work area have been removed. An arrow to the right of the diagram indicates that deconstruction should move 'against' the flow of traffic.

slide notes:

Key Message: Discuss sequence of removal procedures
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: None
Suggested Comments: Removal may start after the work space is clear.
Suggested Questions: None
Additional Information: The MUTCD does not discuss this material.
Possible Problems: None

__________________________________________________ 

slide 34

Get off on the Shoulder

Remove taper and arrow panel

Continue removal against the flow of traffic

Diagram of a two lane roadway where a work zone is being deconstructed. Most of the work zone has been removed, but the initial taper, arrow panel, and advance warning signs remain. An arrow to the right of the diagram indicates that deconstruction should move 'against' the flow of traffic.

slide notes:

Key Message: Discuss sequence of removal procedures
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: None
Suggested Comments: Removal may start after the work space is clear.
Suggested Questions: None
Additional Information: The MUTCD does not discuss this material.
Possible Problems: None

__________________________________________________ 

slide 35

Remove Advance Warning Signs Last!
Why?

They tell drivers to look for you!

Diagram of a two lane roadway where a work zone is being deconstructed. Most of the work zone has been removed, but the advance warning signs remain. An arrow to the right of the diagram indicates that deconstruction should move 'against' the flow of traffic.

slide notes:

Key Message: Discuss sequence of removal procedures
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: None
Suggested Comments:Removal may start after the work space is clear. In Maryland, the preference is to remove the advance warning signs last, with the flow of traffic, as workers are no longer protected by channelizing devices.
Suggested Questions: See slide
Additional Information: The MUTCD does not discuss this material.
Possible Problems: None

__________________________________________________ 

slide 36

Removing Stationary Lane Closures

Reverse the process so the advance warning area is removed last!

Remove "against the flow of traffic"

A 'Road Work Ahead' sign with a caption that reads 'Remove last!!'

slide notes:

Key Message: Summarize sequence of removal procedures
Est. Presentation Time
: 1 minute(s)
Explanation of Cues/Builds
: Text box appears upon click
Suggested Comments
: Reverse the process so the advance warning area is removed last! Remove "against the flow of traffic."
Suggested Questions
: Why?
Additional Information
: The MUTCD does not discuss this material.
Possible Problems
: This is just a summary slide.

__________________________________________________ 

slide 37

Removing Stationary Lane Closures
  1. Make sure the activity area is clear
  2. If required, see that appropriate pavement markings are in place
  3. Remove channelizing devices “against the flow of traffic”

Photo of a worker repositioning a reflective barricade in a night work zone as he faces the flow of traffic.

slide notes:

Key Message: Summarize sequence of removal procedures
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: None
Suggested Comments: Self explanatory
Suggested Questions: None
Additional Information: The MUTCD does not discuss this material
Possible Problems: This slide discusses in words what you just discussed with pictures.

__________________________________________________ 

slide 38

Removing Stationary Lane Closures
  1. Place removal vehicle on shoulder and remove devices upstream from taper by hand
  2. Remove the arrow board after ensuring the roadway is clear
  3. Remove the advance warning signs last after all temporary traffic control devices are removed

slide notes:

Key Message: Summarize sequence of removal procedures
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: None
Suggested Comments: Self explanatory
Suggested Questions: None
Additional Information: The MUTCD does not discuss this material.
Possible Problems: This slide discusses in words what you just discussed with pictures.

__________________________________________________ 

slide 39

Placement Vs. Removal

Photo of a work truck with a trailer-mounted attenuator on a multi-lane roadway. A worker is leaning out to touch a traffic cone that is sitting on the pavement.

slide notes:

Key Message: Discuss options for installation and removal
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: None
Suggested Comments: This photo shows installation practices demonstrated in a closed training environment in Washington State.
Suggested Questions: Is this photo illustrating installation, removal, or both? What are the different ways to remove devices (think about the orientation of the truck)? If this were a highway open to the public, and the truck was being used to remove devices, then it would be driven forward against the flow of traffic. It could also be backed up against the flow of traffic, depending on access to the devices from the other side of this particular truck. The third way would be to remove devices to the shoulder (if possible) and then drive with the flow of traffic to pick them up. What are the pros and cons of each? We examine them on the next slide.
Additional Information: Photo source: WSDOT.
Possible Problems: None

__________________________________________________ 

slide 40

Placement Vs. Removal
  • Alternatives for removing devices against the flow of traffic:
    • Backing
    • Driving forward
  • Or, move devices to shoulder, where applicable, and drive with the flow of traffic for removal May also use rolling roadblocks

slide notes:

Key Message: Discuss alternatives for removing devices
Est. Presentation Time: 2 minute(s)
Explanation of Cues/Builds: None
Suggested Comments: There are a few primary techniques for removing devices. A recent inquiry into removal practices documented that all responding state agencies (26) allow backing against the flow of traffic for removal of devices. One agency requires contractors to remove devices this way, but allows in-house crews to remove devices by driving forward against the flow of traffic. One agency stated that they do not allow crews to drive forward against the flow of traffic. Eight agencies allow driving with the flow of traffic for removal of devices. Seven out of these 8 agencies noted a requirement that shadow vehicles with attenuators be used for protection of the crew when removing devices with the flow of traffic. This setup is similar to a mobile operation (see associated typical application(s) from the MUTCD for mobile operations). Police services may also be utilized to provide a rolling roadblock while crews remove devices (only one agency referenced this practice). It is important to make sure signs are always visible to motorists while crews are installing and removing devices.
Suggested Questions: What are the pros and cons of each?
Additional Information: This information came from 26 state DOT responses to a question posed via the Work Zone Safety Clearinghouse (http://www.workzonesafety.org).
Possible Problems: None

__________________________________________________ 

slide 41

TTC Removal Practices - Trailer Mounted Attenuators
  • Trailer mounted attenuators do not allow for easy backing when removing devices
  • One agency removes the attenuator and backs against the flow of traffic

Two photos of trailer-mounted attenuators attached to work vehicles.

slide notes:

Key Message: Discuss options for removal of devices
Est. Presentation Time: 1-2 minute(s)
Explanation of Cues/Builds: None
Suggested Comments: Maine DOT recently changed to primarily using trailer mounted attenuators. Removal vehicles with trailer- mounted attenuators have issues with backing. Due to the issue of controlling the trailer, Maine DOT considered removing devices with the flow of traffic. After much discussion, they later decided that when a vehicle with truck mounted attenuator is available, devices are removed by backing against the flow. When only a trailer mounted attenuator is available, they remove the trailer and back against the flow of traffic. They considered the option of driving with the flow of traffic as mobile operation using multiple trailer mounted attenuators with arrow boards, but decided that the exposure was short enough that there was less risk from backing without an attenuator compared with the mobile operation. For the mobile operation, a shadow vehicle would follow within 100 feet of the removal truck and another shadow vehicle would stay back to show the flashing arrow and always be in a visible position for motorists approaching. Some agencies may also use another shadow on the shoulder in this setup. In Maine, striping operations on interstates have had issues with shadow vehicles getting hit (moving 20-25 mph); therefore, with slower speeds the trucks in the removal operation would be even more likely to get hit. Overall, backing without an attenuator posed less risk of safety issues.
Suggested Questions: None
Additional Information: None
Possible Problems: None

__________________________________________________ 

slide 42

Installation and Removal of Stationary Lane Closures
  • Install "with the flow of traffic"
  • Remove "against the flow of traffic"

Except for...

A 'Detour' sign.

slide notes:

Key Message: Summarize sequence of removal procedures
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: None
Suggested Comments: Self explanatory
Suggested Questions: Always follow that sequence. There is only one exception. Which one and why?
Additional Information: The MUTCD does not discuss this material.
Possible Problems: None

__________________________________________________ 

slide 43

How would you install and remove this detour?

Diagram showing the work zone setup for a detour for a closed street.

slide notes:

Key Message: Discuss why detours are an exception
Est. Presentation Time: 2 minute(s)
Explanation of Cues/Builds: None
Suggested Comments: How would you install and remove this detour? Drivers would look for signs that are not there yet! So detours are installed "backwards" or "against the flow of traffic."
Suggested Questions: What would happen if we install devices with the flow of traffic? Drivers would look for signs that are not there yet! Poor public relations?
Additional Information: MUTCD 6B.01: Before any new detour or temporary route is opened to traffic, all necessary signs shall be in place.
Possible Problems: None

__________________________________________________ 

slide 44

Installation and Removal Sequence for Detours
  1. Locate and mark detour sign positions
  2. Locate utilities if post mounting devices

Two photos, one of a worker using yellow paint to mark underground utilities and one of a measuring wheel.

slide notes:

Key Message: Summarize sequence of installation and removal of detours
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: None
Suggested Comments: Self explanatory
Suggested Questions: None
Additional Information: The MUTCD does not discuss this material.
Possible Problems: None

__________________________________________________ 

slide 45

Installation and Removal Sequence for Detours
  1. Begin installation with the last sign in the detour series before establishing activity signing and placing devices (unless those signs are covered until detour is in effect)
  2. Detour signs should be removed downstream
  3. Drive through the detour

slide notes:

Key Message: Summarize sequence of installation and removal of detours
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: None
Suggested Comments: Self explanatory
Suggested Questions: None
Additional Information: The MUTCD does not discuss this material.
Possible Problems: None

__________________________________________________ 

slide 46

Field Measurement Techniques
  • Roller Tape
  • Vehicle Odometer (less precise)
  • Skip Pattern
  • Intermediate Reference Location Signs
  • Survey Markings
  • Pacing Method

slide notes:

Key Message: List some field measurement techniques
Est. Presentation Time: 2 minute(s)
Explanation of Cues/Builds: None
Suggested Comments: To approximate the distance in the field, some methods are available:
-Roller Tape: Use a roller tape device for shorter distances (up to ½ mile).
Vehicle Odometer: Use the vehicle odometer to measure longer distances such as longer sign spacing distances in the advance warning area.
-Intermediate Reference Location Signs: Approximate distances using Reference Signs (typically located at one-tenth of a mile spacing).
-Survey Marking: On construction projects, station markings or other survey markings may be used if visible and distances are available.
-Skip-Line Method: Upon arrival at the scene, determine the pattern of the skip lines. Most skip lines are on a “10-30” pattern. This means that the painted lines are 10 feet long and the gap between them is 30 feet long. For this example, there are 40 feet from the beginning of one skip line to the beginning of the next skip line.
-Pacing Method: In advance, determine the length of your stride and how may paces it would take you to cover the distances needed.
Suggested Questions: None
Additional Information: None
Possible Problems: None

__________________________________________________ 

slide 47

Use of Truck-Mounted Attenuators

Photo of truck with an attenuator device mounted at the rear.

slide notes:

Key Message: Introduce TMA as a shadow vehicle to protect workers
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: None
Suggested Comments: Self explanatory
Suggested Questions: Now we know the meaning of these diagonal lines. What is it? Cars should pass on the slide that the lines slope down toward.
Additional Information: The MUTCD does not discuss this material.
Possible Problems: In some states, shadow trucks with TMAs are required during installation. TMAs are discussed in the TCS course in more detail. The discussion here is from the perspective of protecting workers during installation and removal.

__________________________________________________ 

slide 48

Use of Truck-Mounted Attenuators

It is highly recommended that a shadow vehicle with a Truck Mounted Attenuator (TMA) with appropriate warning lights be used when installing and removing devices on multi-lane highways and whenever the shoulder width prevents setup completely off the traveled way.

TMA requirements vary by State

slide notes:

Key Message: Introduce TMA as a shadow vehicle to protect workers
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: None
Suggested Comments: It is highly recommended that a shadow vehicle with a Truck Mounted Attenuator (TMA) with appropriate warning lights be used when installing and removing devices on multi-lane highways and whenever the shoulder width prevents setup completely off the traveled way.
Suggested Questions: None
Additional Information: The MUTCD does not discuss this material.
Possible Problems: In some states, TMAs may be required, not only recommended.

__________________________________________________ 

slide 49

Typical Needs When Setting Up a Work Zone
  • Installation commonly requires 3 to 4 people
  • Additional crew needed for shadow vehicles and advance warning vehicles
  • Also may need flagging devices, channelizing devices, signs and supports, PCMS, arrow boards, etc.

slide notes:

Key Message: Discuss typical needs for setting up a work zone
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: None
Suggested Comments: Commonly, it may take 3 to 4 crew members to set up a work zone. Additional crew may be needed to operate shadow vehicles and advance warning vehicles.
Suggested Questions: None
Additional Information: None
Possible Problems: None

__________________________________________________ 

slide 50

Recommendations for Common Issues and Challenges
  • Determine the best positioning to minimize exposure
  • Follow the traffic control plan (ask about the TCP if in doubt or don’t have one)
  • Select the most appropriate devices (cones = short duration; drums = longer duration)
  • Use shadow trucks with TMAs

slide notes:

Key Message: Discuss ideas for alleviating common issues and challenges
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: None
Suggested Comments:These ideas can help reduce exposure when installing the temporary traffic control zone.
Suggested Questions: None
Additional Information: None
Possible Problems: None

__________________________________________________ 

slide 51

Iowa Weave - Installation and Removal Considerations

Diagram of a traffic control plan.

What are the benefits of this?

slide notes:

Key Message: Discuss one example for how to minimize exposure
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: None
Suggested Comments: A traffic control plan will likely already be designed when installers get involved in the project. The idea here to illustrate a common sense approach to laying out traffic control. This is referred to as the Iowa Weave (although it is no longer in use by the Iowa DOT) or the “Arkansas Shift.” When there is a need to work on both sides of the roadway, a quick change of devices in the shift will allow for closure of either side without the need for removing and reinstalling the merging taper. Consideration must be given to exposure during the phase change.
Suggested Questions: Why merge traffic just to shift them back? To reduce exposure compared with taking up the closure and then reinstalling it when needing to work on the left lane.
Additional Information: This sample was provided by Iowa DOT.
Possible Problems: None

__________________________________________________ 

slide 52

Interior Lane Closure Installation and Removal Considerations
  • Maintains traffic flow
  • May require closing two lanes temporarily for installation and also removal

Diagram of the proper work zone set up for an interior lane closure on a freeway.

slide notes:

Key Message: Discuss Typical Application 38 from the MUTCD
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: None
Suggested Comments: Installation of this setup is similar to the concepts we have described – removal may require extra precautions. The first step is to close the left lane and then install a lane shift to move traffic from the center lane back to the left lane. Installation and removal sequence still follows the principles we have discussed (install with the flow and remove against the flow). Shadow vehicles are highly recommended along with law enforcement assistance to provide protection both during installation and removal (both left lanes may be closed temporarily using shadow trucks and arrow boards to avoid crew exposure in the middle of the roadway while placing and removing devices).
Suggested Questions: What are the pros and cons? Enhanced capacity and reduce exposure, respectively.
Additional Information: Some agencies and contractors may not use a TTC setup like the one shown here except in situations where no viable alternative exists. The reason being that the crew may have added exposure in the center lane during installation and also after all devices have been removed if the right lane and center lane remain open to traffic. A crossover is also an option to borrow a lane from the other direction for a long term application with high volumes.
Possible Problems: None

__________________________________________________ 

slide 53

Median Crossover I&R Considerations

Diagram of the proper work zone set up for a median crossover on a freeway.

slide notes:

Key Message: Discuss Typical Application 39 from the MUTCD
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: None
Suggested Comments: This TA provides guidance on how to close two lanes in one direction on a four lane freeway (2 lanes in each direction). Installation of this setup is similar to the concepts we have described. The first step is to close the lane on the side of the freeway that will accept the diverted traffic. Next, close a lane on the “closed side” of the freeway and shift traffic to the inner lane on the other side. Installation and removal sequence still follows the principles we have discussed (install with the flow and remove against the flow). Shadow vehicles are highly recommended along with law enforcement assistance. Pavement markings are placed on the outside of the devices as shown.
Suggested Questions: None
Additional Information: Other typical applications are available in the MUTCD for review of installation and removal considerations. The MUTCD also states that pavement markings shall be in place prior to opening a temporary roadway or detour route to traffic. Temporary markings may be used for up to 2 weeks prior to installation of permanent markings.
Possible Problems: None

__________________________________________________ 

slide 54

OSHA Approved Platforms

Two photos of truck-mounted attenuators.

slide notes:

Key Message: Discuss some examples of platforms for setting devices
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: None
Suggested Comments: These platforms are in use in some states and have been evaluated by OSHA. This one is in use by the Illinois Tollway Authority. The platforms hold a person or persons and devices that are being placed in the roadway. It is highly recommended that a shadow vehicle follow the installation and removal platform truck to shield the workers from traffic. The platforms shown in the next few slides are designed for installation and removal of different types of channelizing devices (cones, drums, etc.) and can be used to set out portable signs.
Suggested Questions: None
Additional Information: The MUTCD does not discuss this material. Note that harnesses are not recommended as a method of fall protection, as the worker would have to be tethered so tightly (to avoid being dragged behind the vehicle) that it would not allow for feasible placement of devices.
Possible Problems: None

__________________________________________________ 

slide 55

Platform Example in Use

Two photos of platforms mounted to the rear of two work trucks.

slide notes:

Key Message: Discuss some examples of platforms for setting devices
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: None
Suggested Comments: These platforms are in use in some states and have been evaluated by OSHA. This truck is used to install and remove devices. The truck holds the installer as the truck moves slowly downstream / upstream, depending on whether installation or removal is occurring, and depending on the policy for removal (direction of travel).
Suggested Questions: None
Additional Information: The MUTCD does not discuss this material.
Possible Problems: None

__________________________________________________ 

slide 56

Platform Examples

Photos taken from the side of a panel truck showing a platform mounted to the rear of the vehicle.

slide notes:

Key Message: Discuss some examples of platforms for setting devices
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: None
Suggested Comments: These platforms are in use in some states and have been accepted by OSHA. This one is from Guidelines Pavement Striping, Inc.
Suggested Questions: None
Additional Information: The MUTCD does not discuss this material.
Possible Problems: None

__________________________________________________ 

slide 57

Platform Examples

Photos taken from the rear of a panel truck showing a platform mounted to the back of the vehicle.

slide notes:

Key Message: Discuss some examples of platforms for setting devices
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: None
Suggested Comments: These platforms are in use in some states and have been accepted by OSHA. This one is from Guidelines Pavement Striping, Inc.
Suggested Questions: None
Additional Information: The MUTCD does not discuss this material.
Possible Problems: None

__________________________________________________ 

slide 58

Guard Rail System

Photo of the rear of a work truck with an arrow panel mounted on the cab. The truck has a flat bed with guard rails around the sides, and a platform attached to the rear where two signs are displayed: WET PAINT and  PASS WITH CARE.

slide notes:

Key Message: Discuss some examples of platforms for setting devices
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: None
Suggested Comments: These platforms are in use in some states and have been accepted by OSHA. This one attaches to the lift gate.
Suggested Questions: None
Additional Information: The MUTCD does not discuss this material.
Possible Problems: None

__________________________________________________ 

slide 59

Lowered Platforms

Photo of a work truck with an arrow panel above the cab and a flat bed for carrying equipment. Both sides of the flat bed are open, but the rear has a guard rail where signs are attached. Attached to the rear of the truck and extending back several feet is an attenuator device.

slide notes:

Key Message: Discuss some examples of platforms for setting devices
Est. Presentation Time
: 1 minute(s)
Explanation of Cues/Builds
: None
Suggested Comments
: : These platforms are in use in some states and have been evaluated by OSHA. This one is from Superior Road Striping, Inc. and has platforms built into each side of the truck bed. This platform is mainly used for installation and removal of channelizing devices such as cones and possibly drums.
Suggested Questions
: None
Additional Information
: The MUTCD does not discuss this material.
Possible Problems
: None

__________________________________________________ 

slide 60

Lowered Platforms

Photo of the side of a work truck. The truck has a flat bed and contains lowered platforms built into the sides of the vehicle. Attached to the rear of the truck and extending back several feet is an attenuator device.

slide notes:

Key Message: Discuss some examples of platforms for setting devices
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: None
Suggested Comments: These platforms are in use in some states and have been evaluated by OSHA. This one is from Superior Road Striping, Inc. and has platforms built into each side of the truck bed. This platform is mainly used for installation and removal of channelizing devices such as cones and possibly drums.
Suggested Questions: None
Additional Information: The MUTCD does not discuss this material. These lowered platforms with rails are especially good designs for installation and removal of devices.
Possible Problems: None

__________________________________________________ 

slide 61

Automated Cone Truck

Photo of the side of a work truck. The truck has several stacks of traffic cones and an automatic cone setting and retrieval device on the flat bed, and a retracted attenuator device to the rear of the bed.

slide notes:

Key Message: Discuss some examples of platforms for setting devices
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: None
Suggested Comments: This example is from the Minnesota Department of Transportation. It is an automatic cone setting and retrieval truck. The University of California at Davis Advanced Maintenance and Highway Technology Research Center (AHMTC) has also developed some prototypes for cone placement and retrieval.
Suggested Questions: None
Additional Information: The MUTCD does not discuss this material.
Possible Problems: None

__________________________________________________ 

slide 62

Review of Module Objectives
  • Understand safe installation and removal of temporary traffic control devices
  • Identify relevant considerations and safety issues during these activities
  • Describe methods and procedures for safe installation and removal
  • Discuss the importance of proper installation and removal procedures
  • Discuss the sequence to install and remove devices

slide notes:

Key Message: State the module objectives
Est. Presentation Time: Less than 1 minute(s)
Explanation of Cues/Builds: None
Suggested Comments: Each state or local agency may have preferences on how their agency may perform installation and removal of temporary traffic control devices, therefore designers and contractors should check with individual agencies for guidance and/or preference on these procedures.
Suggested Questions: None
Additional Information: None
Possible Problems: None

__________________________________________________ 

slide 63

Module Recap
  • What location do you need to identify first before you lay out the traffic control?
  • Which device is erected first? Last?
  • Which device is removed first? Last?
  • What's the only exception?

slide notes:

Key Message: Recap module
Est. Presentation Time: 1 minute(s)
Explanation of Cues/Builds: None
Suggested Comments: Answers: 1. The beginning of the work space; 2. The advance warning signs / End road work sign; 3. End road work sign / Advance warning signs; 4. A detour.
Suggested Questions: None
Additional Information: None
Possible Problems: Avoid telling the audience the answers to these questions. Their purpose is to gauge understanding.